Quotation.cy

Screeding contractor in Larnaca

Screeding contractor in Larnaca: request quotes from local professionals and compare prices, timings and terms.

Request quotes Professionals

A floor screed creates a flat, level base on the concrete slab before tiles, wood or other flooring go down. Self-levelling compounds are poured in a thin layer and give a very smooth surface, ideal under vinyl or laminate, or as a finished floor in commercial spaces. You will need this on a new build, in a renovation with uneven floors, or when new pipes or underfloor heating are laid.

Larnaca has plenty of new housing and regeneration work, and many properties are close to the sea. There, salt air and humidity call for proper waterproofing and corrosion-resistant materials. Ask professionals to state in their quote which materials they propose and why.

What it includes

  • Site visit and floor level check
  • Cleaning and priming the slab
  • Insulation or membrane where needed
  • Laying screed level or to falls
  • Covering pipework or underfloor heating
  • Self-levelling compound for a smooth finish
  • Expansion joints
  • Epoxy or polyurethane coatings on request

What affects the cost

  • Floor area
  • Screed thickness and unevenness of the slab
  • Material: traditional sand and cement, ready mix or self-levelling
  • Underfloor heating or insulation built in
  • Access and floor level for moving materials
  • Drying time before the final flooring

What to check before hiring

  • Let the screed dry fully before laying wood or vinyl
  • Summer heat dries the surface fast, so ask how it will be cured
  • Ask for the level to be checked with a laser after the work
  • In bathrooms and on balconies make sure there are proper falls to the drain
  • Ask which product and what thickness will be used

How it works

  1. Describe the job and upload drawings or photos. Posting a request is free.
  2. Professionals in your area send quotes with price, timing and terms.
  3. Compare the quotes side by side, ask questions and hire whoever you prefer.

Professionals

There are no professionals listed here yet. Post a request and those who join will be notified.

FAQ

How long does screed take to dry?

It depends on thickness, product and weather. Fast-drying products allow flooring sooner, while wood needs a moisture reading first.

Can self-levelling compound be the final floor?

Some products are designed as a finished floor, usually with a protective coating. Most, however, are a base for another floor covering.

Why does screed crack?

Usually from drying too fast in the heat, missing joints or the wrong mix. Fine hairline cracks are often not a problem under tiles.

The same service in other areas

Related services